WORK SCOPE: To correct the site water drainage around the electrical maintenance room.
This work scope included the following:
- Removal of existing landscape rock
- Reshaping of the soil to create a positive slope away from the building
- Installation of a TPO Membrane to provide a waterproof membrane that prevents water from saturating the soil around the building
- Installation of a Drainage Mat provides a water-pathway
- Re-installation of the existing landscape rock
CUSTOMER: Northgate Construction and US Bank
For more information on your particular scope of work or to request a quote, please use our contact forms below. Whether the job is big, small, or you’re trying to do it yourself, Bloc 7 is here to help!