WORK SCOPE: To correct the site water drainage around the electrical maintenance room.
This work scope included the following:

  1. Removal of existing landscape rock
  2. Reshaping of the soil to create a positive slope away from the building
  3. Installation of a TPO Membrane to provide a waterproof membrane that prevents water from saturating the soil around the building
  4. Installation of a Drainage Mat provides a water-pathway
  5. Re-installation of the existing landscape rock

CUSTOMER: Northgate Construction and US Bank

 